C ChartTest Results |
C charts assess whether the number of defects in each sample is in control. The tests for special causes detect points beyond the control limits and specific patterns in the data plotted on the chart.
|
Note |
You should not use a C chart when your sample sizes vary because the C chart center line and control limits do not account for varying sample sizes. Use a U chart when you have varying sample sizes. |
Example Output |
|
TEST 1. One point more than 3.00 standard deviations from center line. Test Failed at points: 12, 13 |
Interpretation |
The wallpaper data failed the tests for special causes, which provides evidence that the process is out of control due to the presence of special-cause variation. Two data points failed the following tests:
These results indicate that the process is out of control in regards to the number of defects. The factors causing this variation should be identified and corrected.
Free online chart generators for statistical analysis:
Useful tools: