2.1 Significant Production Run
For production parts, product for PPAP shall be taken from a significant
production run. This significant production run shall be from one hour to
eight hours of production, and with the specific production quantity to
total a minimum of 300 consecutive parts, unless otherwise specified by
the authorized customer representative.
This significant production run shall be conducted at the production site,
at the production rate (see Glossary) using the production tooling,
production gaging, production process, production materials, and
production operators. Parts from each unique production process, e.g.,
duplicate assembly line and/or work cell, each position of a multiple
cavity die, mold, tool or pattern, shall be measured and representative
parts tested. |
|